Kushtia DC assures prompt repair of Khulna-Kushtia highway

BSS
Published On: 16 Oct 2025, 12:24 Updated On:16 Oct 2025, 13:19
Photo : BSS

ISLAMIC UNIVERSITY, Kushtia, Oct 16, 2025 (BSS) - The Kushtia Deputy Commissioner (DC) assured that the damaged sections of the Khulna-Kushtia highway will be repaired within a week, with full renovation work scheduled to begin after October 22.

The assurance came following a peaceful demonstration today by students of Islamic University (IU), who highlighted the need for urgent repair of the severely damaged road. 

The students temporarily blocked the highway near the university's main gate, drawing attention to the issue.

Former leaders of the Students Against Discrimination movement also joined the protest. 

After receiving the assurance, the students withdrew the blockade peacefully, expressing confidence that the authorities would take swift action to restore the highway.

  • Latest
  • Most Viewed
E-passport services launched at Bangladesh mission in Addis Ababa
France takes anti-drone measures after flight over nuclear sub base
Palestinians say Israeli army killed man in occupied West Bank
US panel votes to end recommending all newborns receive hepatitis B vaccine
Los Angeles unfazed by Trump threats to move World Cup: organizer
EU hits Musk's X with 120-mn-euro fine, sparking US ire
Trump all smiles as he wins FIFA's new peace prize
Trump takes centre stage as 2026 World Cup draw takes place
Journalists in Bangladesh now able to work freely: Mahbub Morshed
Navy, Police take joint lead
১০