Kushtia DC assures prompt repair of Khulna-Kushtia highway

BSS
Published On: 16 Oct 2025, 12:24 Updated On:16 Oct 2025, 13:19
Photo : BSS

ISLAMIC UNIVERSITY, Kushtia, Oct 16, 2025 (BSS) - The Kushtia Deputy Commissioner (DC) assured that the damaged sections of the Khulna-Kushtia highway will be repaired within a week, with full renovation work scheduled to begin after October 22.

The assurance came following a peaceful demonstration today by students of Islamic University (IU), who highlighted the need for urgent repair of the severely damaged road. 

The students temporarily blocked the highway near the university's main gate, drawing attention to the issue.

Former leaders of the Students Against Discrimination movement also joined the protest. 

After receiving the assurance, the students withdrew the blockade peacefully, expressing confidence that the authorities would take swift action to restore the highway.

  • Latest
  • Most Viewed
BCB announces squad for Windies ODIs
Cigarettes worth Tk 19 lakh seized at Ctg airport
Massive fire breaks out at factory in CEPZ
BKF aims for successful hosting Women's Kabaddi World Cup next month 
Main accused of Gaibandha abduction-rape case held in Nilphamari
Seeds, fertilizers distributed among 5,500 farmers in Jhenaidah
Mymensingh board sees 51.54pc pass rate in HSC exams
Kanchha Sherpa: Last link to Everest's first summit
The Madagascar colonel who sent the president fleeing and took power
Tajul demands maximum punishment for Hasina, 'mastermind of all evil deeds'
১০